A new 15 million euro baggage processing system has been installed at Terminal 2 of Vasil Levski Airport, aiming to increase service speed eightfold.

Key facts
- •The new system became operational on September 2.
- •The project cost 15 million euros.
- •The upgrade is located at Terminal 2 of Vasil Levski Airport.
- •The system is designed to increase baggage processing capacity by eight times.
Starting September 2, a new baggage handling system is operational at Terminal 2 of Vasil Levski Airport. The project represents a 15 million euro investment designed to significantly improve service speeds and accommodate future growth in passenger traffic.
Increased Capacity and Efficiency
The implementation of this new technology is intended to address primary logistical challenges previously encountered during flight operations. By upgrading the infrastructure, the airport aims to achieve an eightfold increase in baggage processing capacity.
Advertisement
This article was independently rewritten by ManyPress editorial AI from reporting originally published by Novinite.


